Strategy 6: Coordinate cross-border transmission planning and system operation
Wheeling of electricity across different national grid networks requires transmission systems to be physically interconnected. To interconnect two separate national power systems, it is important to harmonize grid codes encompassing frequency, voltage and thermal limits. Furthermore, metering connection, protection schemes, transmission planning and scheduling need to be coordinated among the technical institutions and power utilities of member States in each subregion for the safe and reliable flow of electricity.
To encourage the development of cross-border power generation projects, power utilities could plan and develop adequate electricity transmission infrastructure to allow open access for developers to transmit power.
System operators, transmission utilities and technical institutions in each country, with the support of ESCAP, subregional institutions, Governments and multilateral institutions, can create coordinated mechanisms in each subregion for transmission planning and operation of the interconnected system. It is important that national transmission plans and cross-border transmission plans be compatible with one other.
These bodies, as mentioned in paragraph 38, can facilitate the harmonization of grid codes and technical regulations, grid master plans, protection schemes and scheduling, along with feasibility studies for the smooth interconnection of power systems in each subregion, in accordance with priorities and policies of member States.
Key milestones
Establishment of coordinated mechanisms for cooperation among system operation and transmission utilities.
Time frame
Medium-term.
Key implementers
Member States, with support from the secretariat, subregional organizations, multilateral development banks and specialized institutions.
Projects and events
- 1st Asia-Pacific Regulatory Forum on Power System Connectivity (19-20 July 2022) https://www.unescap.org/events/2022/1st-asia-pacific-regulatory-forum-power-system-connectivity
- Regional Power Grid Connectivity in North-East Asia - Green Power Corridor https://www.unescap.org/sites/default/d8files/event-documents/1-0_ESCAP.pdf
- Workshop: Developing North-East Asia Green Power Corridor Modelling Scenarios (17 May 2022) https://www.unescap.org/events/2022/workshop-developing-north-east-asia-green-power-corridor-modelling-scenarios
- ESCAP-GTI Seminar on Energy Cooperation in North-East Asia: Regional Power Trade and Connectivity in North-East Asia (7 July 2021) https://www.unescap.org/events/2021/escap-gti-seminar-energy-cooperation-neasia