Strategy 2: Develop a regional cross-border electricity grid master plan
Today, grid interconnectivity in the Asia-Pacific region operates on a bilateral basis and is limited in its extent. To promote connectivity for the broader region, it is important to discuss and develop a grid master plan for the interconnection of the region’s power grids. The development of a grid master plan should adhere to the principles of energy security, grid stability, economic feasibility and inclusiveness, by reflecting the concerns and demands of relevant stakeholders. It will not be a legally binding document; rather, it will be voluntary in nature and will take into account each country’s energy policy and power system.
To support this, there should be greater networking of subregional intergovernmental institutions, including multilateral institutions. This will enable member States to identify and enhance the economic, social and environmental benefits of cross-border electricity trade and agree on the architecture of a regional cross-border grid. Member States may then agree upon implementation of power system connectivity in a phased manner through bilateral or subregional cooperation.
Taking into account that the Asia-Pacific region also consists of many archipelagic countries where power grid integration is a big challenge, addressing security of supply and connectivity for the region is of the utmost necessity. Power exchange is considered the most effective way to ensure energy as opposed to fuel transport. It is important to seek the best policies, regulations and business models to address power grid connectivity in this particular region.
Key milestones
Regional grid master plan might be agreed by member States by 2025 and mapping of the region’s existing high voltage transmission network by 2022.
Time frame
Medium-term.
Key implementers
Member States, with support from the secretariat and subregional institutions.
Projects and events