Nepal: Tentative plan for carrying out environmental audit
(An example of Environmental Audit applied in Hydropower project in Nepal)
I. Physical Aspects
Air Quality
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Total Suspended solid particulate |
Weir and powerhouse sites and access road |
Low-volume Sampler |
Analysis data |
The amount and types of SSP;
- pre-project
- during construction
- after construction, and their comparison with ambient standards
|
| Dust from construction activities |
Access Road. Head works, and Power house sites |
Visual Inspection |
Information from local people |
Dust accumulation
- in house
- plants leaves
- surroundings
|
Noise Level and Vibration
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Measurement of decibels |
Weir and powerhouse and near by villages |
Decible meter |
Measurement and information from
local people |
Noise levels;
- pre-project
- during construction
- after construction
- their comparison with ambient standards
|
| Intensity of noise during construction |
construction sites |
Questions |
Local people |
- any hearing impairment case
|
| Cracks of buildings |
Crack locations |
Questions |
Local People |
Cracks existed in house, and compensation |
Water Quality
| Parameters |
Location |
Methods |
Sources |
Indicators |
Temperature, pH, Turbidity
TSS, DSS, hardness, chloride Sodium, oil and grease
Coliform, DO, BOD, COD. |
Headworks and Power house sites |
Water samples collected from different source |
Analytical data |
Comparison with ambient water quality;
- pre-project
- during construction
- after construction
|
Disposal of Spoils and Construction Wastes
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Disposal of
construction spoils |
Designated sites |
Observation/ interview
of local people |
Local information
and observation |
- initiated erosion
- affected the aesthetic value
- affected forest and agriculture
|
| Side casting of
excavated soils and
wastes |
Intake, audits and
Powerhouse sites |
Observation/ interview |
Local information |
- initiated land erosion
- local drainage
- project
|
Erosion and Slope Stability
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Disturbance to natural
slope |
Intake, road and
powerhouse sites |
Visual observation |
Local Information
Photographs |
Eroded and unstable areas |
| Slope Protection
measures |
As recommended in
EIA |
Visual observation
Photographs |
Local Information |
Stabilized disturbed slopes |
| Adequate drainage
facilities such as catch
drains, herringbone
drains, side drains |
Powerhouse, Intake,
road and mostly in
unstable area.
|
Visual observation
Photographs etc.
|
Local information
|
Drainage facilities installed
and number of disturbed
area due to the lack of
drainage |
| Plantation of Disturbed
slopes |
Cut slopes and area
where vegetations
were cleared |
Visual observation
Photographs |
Local Information |
All disturbed slopes have
been revegetated |
| Temporary workforce
sites cleaned and
restored to original
condition |
Project area |
Visual inspection |
Contractors |
Workforce camps cleared
and restored to original
condition |
II. Biological Aspects
Forest and Vegetation
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Number of wooden
house Constructed in
the project site |
Roadside Project and
at the vicinity of
project area |
Counting, visual
Observation
|
Local People
|
No of wooden house
increased in project area |
| Number of tea stalls
and restaurants
established during
construction |
Project site |
Observation and
records |
Local People |
Number of tea stalls and
restaurants increased |
| Fuel wood trade
location of timber
depots and fire wood
sale in the project
construction |
Project site |
Records
|
Local People
available
information |
Volume of wood sold
increased |
| Number of stumps of
cut trees in nearby
forest |
Forest area nearby |
Examination of forest |
Local people |
Number of cut tree stumps
increases |
| Alternative Energy for
cooking for labour
force |
Project sites |
Records from the
contractors |
Local people |
Kerosene was provided |
| Harvesting and trade
of medicinal plants |
Project sites and the
market |
Information form local
people and market |
Local people |
Sales of medicinal herbs
increased |
| General condition of
forest nearby |
Forest near project
site |
Observation |
Information and
Local people |
Forest condition
deteriorated |
Wildlife and Fauna Composition
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Wildlife hunting
trapping and poaching
by workforce |
Forest area near the
project site |
Interview with local
people and
photographs |
Local people |
Number of wild animal seen
decreased |
| Trading of wildlife
products dried meat,
leather, fur |
Project site and
market |
Observation interview
and photographs if any |
Local people |
Sales of animal product
increased |
| Frequency of the birds
and mammals seen
before and after the
project |
Project area |
Observation Interview |
Local people |
Frequency of wild animal
and birds seen in project
area decreased |
Fish and Fisheries
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Species of fish
occurrence and
abundance before
and after the project |
Sampling stations at
the project sites |
Sampling |
Local fishermen |
Species of fish in the river
increased / decreased |
| Fishing activities of
workforce |
Project site |
Interview |
Local people |
Fishing activities increased |
| Use of explosive,
electric rod and net |
Project site |
Interview |
Local people
|
Use of explosive
observed/not observed |
III. Socio-Economic Aspects
Employment Opportunity
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Number of local labors
employed in the
project construction |
Project Site |
Analysis of records
interview |
Records from
Contractors and
Local people |
Percentage of local labours
were higher / lower |
| Number of Women
Workforce |
Project Sites |
Records |
Local people |
Percentage of women
workers were higher than
30% |
Trade, Commerce and Industry
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Number and types of
shops established
during construction
and how many of them
are existing after the
construction |
Road sides and in
project sites |
Records |
Records and local
people |
- Number of shops increased / decreased during construction
- Majority of shops are still operations/closed
|
| Establishment of
industry in the vicinity
of project site |
Project sites and
surroundings |
Records |
Observation and
local people |
New industries
established/no
establishment |
| Effects on already
existing local and
traditional industries |
Local area |
Records |
Local people |
Traditional industries
suffered / flourished |
| Rent of house and
land space, before
during and after the
project |
Local area |
Inquiries |
Local tenants and
local people |
Rent of house before/
during and after project has
increased/decreased |
Compensation
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Use of compensation
received |
Local area / Out of the
area |
Questionnaire survey
and interview |
Local people |
- beneficial use
- unnecessary use
- migrated
|
Price Rise
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Rise in the price in
essential commodities
in the construction and
after construction |
Local Market |
Interview with Local
people and shops |
Local people |
Rise/decrease in prices
during and after the project |
Occupational Safety and Health
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Types and numbers of
accidents occurred
during construction |
Project sites |
Records |
Records from
contractors and
local people |
Number and type of
accident |
| Adequacy of
occupational safety
measures provided by
the project |
Project sites |
Records |
Records from
contractors and
Local people |
Adequate/ Inadequate |
| Facility of First aid
emergency Services
provided |
Project site |
Records |
Records of office
Local people |
Provided/ not available |
| Compensation to the
loss of life or disability |
Project site |
Records |
Records of
contractor, office
of Project
management and
local people |
Provided/ not provided |
| Cases of
communicable
diseases |
Project sites |
Records |
Medical records
from local medical
center, Interview |
Number of cases of
communicable diseases |
Socio-Culturally Undesirable Activities
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Prostitution |
Project site and at the
vicinity |
Sample interview |
Local people |
Were there any indication of
prostitution ? |
| Liquor production and
consumption |
Project site |
Interview |
Local people |
Liquor consumption high
moderate |
| Disputes and crimes |
Project Sites |
Records from local
police and project
Management |
Local people |
Cases of dispute/ crime |
| Use of child labour |
Project site |
Records |
Records from
contractor and
local people |
Records of child labour |
Complaints from The Local People
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Types of damages
made on personal
properties |
Project site and its
vicinities |
Records |
Local people |
Cases of damages or no
cases |
| Damages to local
infrastructure such as
road and irrigation and
suspensions bridges |
Within the periphery of
project area |
Records |
Concerned
agencies |
Damages on:
- bridge
- irrigation
- road
- water supply
|
| Compensation for
maintenance and
rehabilitation of
Irrigation Project |
Project area |
Interview |
Concerned
agencies and
project
management |
Comparison for damage |
| Losses causes by
blasting, vibration and
noise and
compensation paid |
Project area and its
vicinity |
Records |
Local people and
project
management |
Compensation for losses |
Coordination and Communication
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Coordination among
district administration
politicians, project
management,
contractors and labors |
District Head Quarter,
Project site |
Records and interview |
District
headquarters
government line
agencies project
management,
contractors and
labour |
Coordination or No
coordination |
| Information
dissemination to
workers, local people
about the project
implementation |
Local area |
Means of information
dissemination |
Local people,
project staffs,
labours |
Adequate dissemination or
Inadequate |
IV. Overall Socio-Economic Changes
| Parameters |
Location |
Methods |
Sources |
Indicators |
| Changes in land use
pattern |
Project area VDCs |
Interview/ Observation |
Farmers and local
entrepreneurs |
Indication of changes |
| Changes in local
economy (Standards
of living) |
Project area VDCs |
Interview |
Local people and
business
community |
Standards of living
increases/ decreased in
compared to pre-project
condition |
|